4LEAF provided CM and Inspection Services for this $6M waterline replacement project.  First Street is a Caltrans-operated roadway, so considerable coordination has been required with Caltrans to obtain an encroachment permit for construction. The project consisted of the installation of 8,050 l.f. of 24-inch waterline, valves, and fire hydrants; tie-in of new mains to existing mains; replacement of service laterals up to existing water meters; and replacement of water meters and water meter boxes where appropriate. Permanent trench paving was completed using a special Caltrans specification and inspections were performed per the 2015 Caltrans Standard Plans and Specifications. 4LEAF utilized the cloud-based program Procore to all project documents (RFIs, submittals, change orders, schedules, project files, daily reports, and project photos).

Services performed by the 4LEAF team included:

  • Performing constructability review of 90% plans and specifications.
  • Performing extensive Public outreach and coordination with local businesses and residents.
  • Coordination w/ Caltrans for various permits.
  • Providing daily inspections and daily report documentation of job-related activities.
  • Continually monitoring the contractor’s traffic control to ensure compliance with the project’s traffic control plans. 
  • Monitoring the contractors’ daily storm water protection.
  • Chairing and attending weekly meetings with the City, contractors, client, and various project stakeholders.
  • Monitoring and documenting the contractor’s work for adherence to contract plans and specifications.
  • Collecting and maintaining digital photographs of all daily construction activities.
  • Reporting all discrepancies requiring corrective actions to City staff.
  • Meeting with the contractor to review proposed work and schedule inspections.
  • Reviewing and approving contractor monthly pay requests and make recommendations to the City for approval.
  • Reviewing contractor submittals for City-directed contract change order requests.
  • Negotiating with contractor for change orders.
  • Developing “punch list” items and following-up with corrective measures with the City’s staff.