Tower Bridge Gateway Project

,

4LEAF provided full-service construction management and on-site construction inspection services for this dynamic $5 million project.  This project reconfigured the eastern end of the Tower Bridge Gateway from a former freeway to a boulevard that serves the Bridge District and Washington neighborhoods as well as through traffic.  The existing underpass at Third Street was eliminated, and a new intersection at Fifth Street connects with Riske Lane behind Raley Field.  Two new at-grade intersections were constructed at Fifth Street and Third Street, linking to the adjoining street network and accommodating pedestrian crossings. The improvements integrate Tower Bridge Gateway and the surrounding street network, removing the major obstacle to the development in the City’s Bridge District and the Washington Specific Plan area.  It completes the connection to the newly developed Civic Center area.